

New industrial gas inflows were received from the Galkynysh field
The drillers of the Turkmengaz State Concern drilled a well with a depth of 4.6 km on the territory of the Galkynysh supergiant field, and also carried out blasting operations at a depth of 4.5 — 4.3 km, receiving industrial gas inflows as a result of high pressure.



















