The Burnebitgazkhyzmat department of the Nebitgazburavlayish trust is achieving high production figures. In the first two months of this year, the volume of work completed amounted to approximately 1,503,000 manats, demonstrating the effectiveness of its workforce and the well-organized production process.
The Burnebitgazkhyzmat department was established on March 1, 2006, as part of the Turkmennebit State Concern. Since the beginning of this year, the Nebitgazburavlayish trust's drilling departments—Nebitdag, Goturdepe, Korpedje, and Ekerem—have completed 19,610 meters of drilling, against a planned target of 11,300 meters, representing 173.5% of the planned volume.
All work is carried out in accordance with modern technological standards. The required sites are provided with a continuous supply of drilling, installation, and production pipes, ensuring process continuity.
The department actively utilizes seven overhead cranes with a lifting capacity of 12.5 tons, five truck cranes from 12 to 25 tons, and dozens of heavy-duty Kamaz and Mercedes trucks.
In the installation pipe refurbishment unit, specialists reprocess and clean the pipes, ensuring their uninterrupted delivery to drillers. The condition and pressure of all pipes, both new and used, are tested on powerful ASW-1050 and ASW-700 units, after which the relevant documentation is prepared.
The bentonite production unit plans to produce 6,500 tons of bentonite mass annually.
These indicators demonstrate the high level of organization and professionalism of the Burnebitgazkhyzmat management team, serving as an example of effective work within the Nebitgazburavlayish trust system.
ORIENT
